Ar Rjum Gold Mining Project — Industrial Concrete Infrastructure
Al Muwayh area, Makkah Province, Saudi Arabia
Ready Mixed Concrete (RMC)
Gold mining and industrial infrastructure
Dedicated batching plant installation, operation and RMC supply incorporating microsilica
Project Overview
Ma'aden's Ar Rjum Gold Mining Project is an important industrial mining development supported by Bechtel's engineering, procurement and construction-management role. Concrete operations in this environment must respond to demanding industrial foundations, production requirements and the logistics of a remote construction site.
GICL has prepared a project-dedicated batching and ready-mix concrete arrangement for Ar Rjum. The offering covers batching-plant installation, operation and supply of ordinary Portland cement concrete incorporating microsilica, tailored to the industrial works and project specifications.
The batching arrangement integrates plant mobilisation, materials handling and quality-controlled concrete production within a coordinated supply system. It is designed to support demanding construction work fronts through reliable dispatch and concrete-placement planning.
Interested in this type of project?
Talk to our team about how GICL can deliver similar works for your programme.
Discuss Your Project