GICL project image placeholder
Back to Projects
OngoingRMC
Global Infrabuild Consortium Limited Company

Ar Rjum Gold Mining Project — Industrial Concrete Infrastructure

Location

Al Muwayh area, Makkah Province, Saudi Arabia

Project category

Ready Mixed Concrete (RMC)

Project type

Gold mining and industrial infrastructure

Project scope

Dedicated batching plant installation, operation and RMC supply incorporating microsilica

Project Overview

Ma'aden's Ar Rjum Gold Mining Project is an important industrial mining development supported by Bechtel's engineering, procurement and construction-management role. Concrete operations in this environment must respond to demanding industrial foundations, production requirements and the logistics of a remote construction site.

GICL has prepared a project-dedicated batching and ready-mix concrete arrangement for Ar Rjum. The offering covers batching-plant installation, operation and supply of ordinary Portland cement concrete incorporating microsilica, tailored to the industrial works and project specifications.

The batching arrangement integrates plant mobilisation, materials handling and quality-controlled concrete production within a coordinated supply system. It is designed to support demanding construction work fronts through reliable dispatch and concrete-placement planning.

Consortium Members

Global Infrabuild Consortium Limited Company

View All Consortium Members →

Interested in this type of project?

Talk to our team about how GICL can deliver similar works for your programme.

Discuss Your Project